Spares & Equipment Supply – CTS Offshore and Marine Limited https://www.ctsom.com CTS Offshore and Marine Limited Fri, 19 Mar 2021 09:52:24 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.17 https://www.ctsom.com/wp-content/uploads/2022/11/cropped-Asset-1-32x32.png Spares & Equipment Supply – CTS Offshore and Marine Limited https://www.ctsom.com 32 32 Vessel Returns to Service After Extensive Repairs https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/ https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/#respond Thu, 18 Mar 2021 12:11:57 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21473 CLIENT | PMSCs Service Provider VESSEL | Research Vessel DATE |October - November 2020 LOCATION | Stellendam, Netherlands  Overview The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the [...]

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | PMSCs Service Provider

VESSEL | Research Vessel

DATE |October – November 2020

LOCATION | Stellendam, Netherlands 

Overview

The client contacted CTS to oversee the re-activation of their vessel. CTS was tasked with ensuring that the vessel’s technical compliance aligned with the port authority’s regulations and allowed for safe navigation. The vessel had been out of service for over a year, and neither the main engine nor any of the four
generators were running. It was no surprise that the vessel required an extensive amount of repair work.

Scope of Works

• Steel fabrication and installation
• Inspections and surveying
• Generator overhaul and repair
• Spares and equipment supply
• Electrical instrumentation

Project Gallery

Result

CTS oversaw the yard’s scope and provided the client daily reports on the repair process. CTS also brought in a team of specialists to resolve the electrical issues and fully repair the main engine and generators. Despite the significant amount of work required, with strong communication and thorough planning, CTS was able to deliver the project on schedule.

Client Feedback

“We appreciate the CTS’s flexibility and the team’s ability to manage the varying demands of the work scope.We look forward to working with them again on future projects.”

Managing Director

Download Case Study

Vessel Returns to Service after Extensive repairs

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Vessel Returns to Service After Extensive Repairs appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/vessel-returns-to-service-after-generator-repairs/feed/ 0
Quick-Response Mobilization for Anchor Replacement https://www.ctsom.com/case-studies/quick-response-mobilization-for-anchor-replacement/ https://www.ctsom.com/case-studies/quick-response-mobilization-for-anchor-replacement/#respond Fri, 04 Sep 2020 09:02:42 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21281 CLIENT | Cruise Ship Management Company VESSEL | Passenger Ship DATE | June 2020 LOCATION | Southampton, UK Overview CTS Offshore and Marine received an inquiry from a Cruise Ship Management Company to replace their passenger ship’s HHP type, stockless anchor. CTS quickly [...]

The post Quick-Response Mobilization for Anchor Replacement appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Cruise Ship Management Company

VESSEL | Passenger Ship

DATE | June 2020

LOCATION | Southampton, UK

Overview

CTS Offshore and Marine received an inquiry from a Cruise Ship Management Company to replace their passenger ship’s HHP type, stockless anchor. CTS quickly responded to the inquiry and was promptly awarded the job. CTS immediately mobilized a six-man team and the necessary lifting equipment to carry out the job. Our team developed a work procedure and provided port permits to remove and replace the anchor swiftly and carefully.

Scope of Works

With a 100-ton crane and an aerial work platform, our team was able to lower the old anchor into a safe position to allow for the crane’s straps to be attached. Once attached, the old anchor was lifted onto the quayside, where CTS teams proceeded to remove its chain. The chain was then carefully placed aside
until the new anchor arrived to prevent any potential damage to the ship. Once the new anchor arrived, it was lifted onto a work barge while the chain was lowered by the crew to commence the attachment. After the anchor replacement was completed, the new anchor was hoisted into its holding cradle in the bow. The old anchor was then taken for disposal as per client instruction.

Project Gallery

Result

To meet the vessel’s tight deadline, CTS suggested the swivel shackle be replaced in addition to the anchor to allow for quicker turnaround time. CTS was able to source the replacement anchor and swivel shackle quickly and completed the work within the required time frame.

Client Feedback

“Impeccable service. The team was very knowledgeable and worked efficiently to finish the project safely and on time. I would highly recommend CTS’s services and look forward to working with them in the future.”

– Staff Captain

Download Case Study

Case study anchor replacement

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Quick-Response Mobilization for Anchor Replacement appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/quick-response-mobilization-for-anchor-replacement/feed/ 0
Engine Overhaul and Customization Restores Bulk Carrier https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/ https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/#respond Fri, 01 May 2020 10:51:21 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=21070 CLIENT |Vessel Owner VESSEL | Bulk Carrier DATE | September 2019 LOCATION | Singapore Overview CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of [...]

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT |Vessel Owner

VESSEL | Bulk Carrier

DATE | September 2019

LOCATION | Singapore

Overview

CTS was approached by the vessel owners to replace a damaged Yanmar 6EY22W engine onboard one of their bulk carriers. CTS, with their Yanmar specialist (twelve years of experience), compiled a six-man team to ensure that the overhaul went smoothly. The team was met with a challenge when it came to getting the new engine inside the engine room as the skylight was small, and the engine itself was over the safe working load limit of the vessel’s crane. There were also no lifting points or standard procedure to lift the engine. However, after careful planning, the team was able to come up with a tailor-made solution.

Scope of Works

CTS conducted a risk assessment for the necessary lifting works, and new strong points were welded in the engine room to facilitate the transfer of the engine and to mitigate the risk to a minimum. Despite the restricted entry space for the engine, the team was able to solve the issue by dismantling the engine in the CTS workshop and customizing it to fit the existing bedplate. CTS specialists also designed and fabricated a structure to lift the engine vertically so it could easily pass through the skylight. Once the engine was mounted on the bedplate and built up, the electrical system was modified and made compatible with the new engine. The engine was commissioned, and all trials carried out were witnessed by the class surveyor.

Project Gallery

Result

The job was complicated by the limited space of the engine room; however, the CTS service team was able to adapt and worked efficiently to complete the overhaul. The scope of work was completed within seven days. The client appreciated CTS’s professional and thorough approach and was satisfied with the team’s quality work.

Client Feedback

“The job was executed very safely and professionally. The team was experienced in their work. The engineer had an excellent knowledge of the engine.”

– Vessel Manager 

Download Case Study

Engine Overhaul and Customization Restores Bulk Carrier

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Engine Overhaul and Customization Restores Bulk Carrier appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/engine-overhaul-restores-bulk-carrier/feed/ 0
Multiple Projects Completed On Board Cruise Vessel https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/ https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/#respond Fri, 17 Jan 2020 11:05:08 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=20487 CLIENT | Columbia Cruise Services VESSEL | Cruise Vessel LOCATION | Cadiz, Spain DATE | Nov-Dec 2019 Overview A highly skilled team of 38 specialists were selected to complete a series of projects for Columbia Cruise Services’ passenger vessel. Columbia Cruise Services had a [...]

The post Multiple Projects Completed On Board Cruise Vessel appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Columbia Cruise Services

VESSEL | Cruise Vessel

LOCATION | Cadiz, Spain

DATE | Nov-Dec 2019

Overview

A highly skilled team of 38 specialists were selected to complete a series of projects for Columbia Cruise Services’ passenger vessel. Columbia Cruise Services had a wide range of work requests, therefore CTS prepared an extensive strategy in order to complete all the project tasks on time and to ensure that everything suited their needs. The team consisted of naval architects, class approved welders, electricians and tank cleaners. The CTS team spent a total of 23 days on board the dry-docked ship.

Scope of Works

  • Turnkey installation of Alfa Laval 3.1 Compact Flex BWTS including scanning, design and engineering works
  • Fuel oil tank cleaning
  • Funnel reinstatement
  • Low-level location lighting replaced for all passenger and crew areas

Project Gallery

Result

The project was completed successfully and on schedule despite the constraints of working within the confined space of the vessel and the lack of drawings available. The team also experienced a challenge when it came to integrating the ballast water treatment plant with the on-board automation system. However, through thorough planning and strong communication between parties, the job was finished with outstanding craftsmanship and exceeded the client’s expectations.

Client Feedback

“Excellent job. The crew was disciplined, professional and ensured that all the jobs were completed on time and up to standard. Quality work, we would recommend CTS Offshore and Marine for future projects.”

Technical Superintendent

Download Case Study

Multiple Projects Completed On-board Cruise Vessel

Subscribe to our mailing list

* indicates required

Please select all the ways you would like to hear from CTS Offshore and Marine Limited:

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

The post Multiple Projects Completed On Board Cruise Vessel appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/multiple-projects-completed-board-cruise-vessel/feed/ 0
New Regulation – Panama Canal Modifications on LPG Fleet https://www.ctsom.com/case-studies/cts-completes-new-panama-canal-modification-lpg-fleet/ https://www.ctsom.com/case-studies/cts-completes-new-panama-canal-modification-lpg-fleet/#respond Fri, 20 Jan 2017 12:40:36 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=19178 CLIENT | Northern Marine Management LTD VESSEL | LPG Carrier DATE | January 2017 LOCATION | Singapore Project Brief Client required modification of mooring arrangement to meet the new Panama Canal Modification in accordance with regulations N01-2014-Rev01. Modification as a turn-key solution, including supply [...]

The post New Regulation – Panama Canal Modifications on LPG Fleet appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Northern Marine Management LTD

VESSEL | LPG Carrier

DATE | January 2017

LOCATION | Singapore

Project Brief

Client required modification of mooring arrangement to meet the new Panama Canal Modification in accordance with regulations N01-2014-Rev01.

Modification as a turn-key solution, including supply of suitable fittings, materials, consumables and skilled, qualified coded welders’ team to carry out the work as per class approved drawings at OPL Singapore safely and in short time. Class surveyor was only available to attend at inner anchorage, so work had to be completed flawless as no hot work allowed at inner anchorage.

Risk assessment and JSA was carried out to identify all hazards prior to commencing with proper safety planning and additional measures to ensure safe operations.

CTS provided a dedicated certified skilled steel team to work round the clock with aim to complete job in record time without any down time.

Scope of Work

  • CTS teams used Class approved engineering drawings.
  • All steel materials, underdeck fitting and Panama chocks foundation was pre-fabricated in our workshop.
  • Mooring fittings supplied.
  • Risk assessment, JSA and daily toolbox meetings were conducted with a proper safety plan in place.
  • Complete staging erected in the required areas.
  • CTS team of skilled certified fitter/welders did the installation as per approved drawings.
  • All documents and certificates provided to class.
  • NDT inspection was carried out using UT/MPI and witnessed by class.

Work was completed satisfactorily to attending class surveyor satisfaction.

Project Gallery

Results

Work on all 3 vessels was completed safely and in time to the satisfaction of the client and attending Class surveyor without any downtime.

Client Feedback

Clients were extremely happy how CTS handled the project and were able to deliver a turn-key solution IN-TIME with ZERO accidents. “Excellent work”.

Download Case Study

Mooring Modification Case Study for Panama Canal

The post New Regulation – Panama Canal Modifications on LPG Fleet appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/cts-completes-new-panama-canal-modification-lpg-fleet/feed/ 0
Boiler survey for LNG fleet completed with no downtime https://www.ctsom.com/case-studies/boiler-survey/ https://www.ctsom.com/case-studies/boiler-survey/#respond Wed, 06 Jul 2016 15:00:09 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=18407 CLIENT | Oil Major VESSEL | LNG Fleet DATE | May 2016 LOCATION | Fujairah Project Brief CTS Offshore and Marine was called on by the client to provide a highly capable professional team and equipment to assist their class annual boiler surveys. The [...]

The post Boiler survey for LNG fleet completed with no downtime appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Oil Major

VESSEL | LNG Fleet

DATE | May 2016

LOCATION | Fujairah

Project Brief

CTS Offshore and Marine was called on by the client to provide a highly capable professional team and equipment to assist their class annual boiler surveys.

The scope of work varied as per the condition & CLASS Surveyors demand in limited vessel stay at Fujairah Anchorage.

Scope of Work

 • Boiler Survey Team
CTS arranged a skilled member team of experienced boiler technicians to attend the vessel and assist with Boiler survey.
CTS Team carried out overhaul of Aux. boiler & economizer mounting valves, hand holes & manholes.
The Safety valves overhaul and test were carried out on-board using the CTS Supplied testing kit.

• Spares & Equipment Supply
CTS arranged portable valve testing kit. Bonnet gaskets for all valve, metal gaskets for hand hole & manhole doors and safety valves were also provided by CTS.
Non-standard metal gaskets were fabricated and were supplied.

Project Gallery

Results

The hand selected CTS team achieved timely completion by providing experienced personnel and arranging required gaskets quickly. All surveys were witnessed by CLASS.

It took CTS teams only 4 days to complete all four boilers. Time saving for client as safety valves were tested on-board and cost-saving due to reduced launch services and Class attendances.

Client Feedback

“The team worked safely, efficiently and managed to give way more than expected.”

Download Case Study

Boiler Survey Case Study

The post Boiler survey for LNG fleet completed with no downtime appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/boiler-survey/feed/ 0
Damaged Cargo Tank Safely Restored in record time https://www.ctsom.com/case-studies/cts-steel-expertise-safely-restore-damaged-cargo-tanks-4-days/ https://www.ctsom.com/case-studies/cts-steel-expertise-safely-restore-damaged-cargo-tanks-4-days/#respond Wed, 15 Jun 2016 09:58:20 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=18243 CLIENT | Vessel Owner VESSEL | Blue Crystal DATE | April 2016 LOCATION | Singapore Project Brief CTS Offshore and Marine received an enquiry to carry out urgent steel repairs on a vessel’s damaged cargo tanks at Singapore. The vessel was inspected, and a [...]

The post Damaged Cargo Tank Safely Restored in record time appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Vessel Owner

VESSEL | Blue Crystal

DATE | April 2016

LOCATION | Singapore

Project Brief

CTS Offshore and Marine received an enquiry to carry out urgent steel repairs on a vessel’s damaged cargo tanks at Singapore.

The vessel was inspected, and a plan was submitted within a day’s notice. The execution plan took into account the restriction of hot work permit availability of only 4 days by Singapore Port Authorities and the requirements to complete to the satisfaction of CLASS. Time was of the essence for the vessel to meet the next Lay-Can.

CTS Offshore and Marine deployed a team of 40 skilled manpower & immediate pre-fabrication of girders and bulkheads in our workshop was started. The tasks were coordinated with precision and safely executed without the need of taking the vessel to the shipyard, saving the owners considerable time and costs.

Scope of Work

  • Steel repair / renewal work
  • Riding teams & equipment supply
  • Scaffolding & painting
  • NDT inspection

A team was deployed to take up the task at anchorage; it required tower staging of 14m high and 12m wide in 4 different locations to renew steel of about 8 MT.

The job was immaculately planned, with the prefabrication of the girders and the bulkhead at CTS workshop ashore, whilst the team on board cut the damaged steel. The prefabrication was then transported to the vessel and fitted diligently.

On request of the owners, additional required services for accommodation furniture and PV valve testing were seamlessly arranged.

Project Gallery

Results

The corrugated Bulkhead in way COT no 4 and 5 was renewed, tested in presence of owners and to the satisfaction of CLASS. The new steel was coated to the paint maker’s standard and tanks were made ready for the next cargo loading timely and with zero incidents. The vessel met its lay-can and owners were extremely pleased with how CTS understood the urgency of the situation and delivered accordingly.

Client Feedback

“Excellent teamwork shown by your team and well guided by Mr Raju to finish the job in stipulated time.”

Download Case Study

Cargo Tank Restored Case Study

The post Damaged Cargo Tank Safely Restored in record time appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/cts-steel-expertise-safely-restore-damaged-cargo-tanks-4-days/feed/ 0
Thermal Imaging Cameras Supply for Selandia Tankers Fleet https://www.ctsom.com/case-studies/hight-quality-thermal-imaging-cameras-supply-selandia-tankers-fleet/ https://www.ctsom.com/case-studies/hight-quality-thermal-imaging-cameras-supply-selandia-tankers-fleet/#respond Tue, 19 Jan 2016 13:46:15 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=18033 CLIENT | Selandia Ship Management VESSEL | Whole fleet + Tankers DATE | Oct. 2015 LOCATION | Various Project Brief CTS Offshore and Marine Limited received an enquiry from Selandia Ship Management, one of the leading ship managers in the world, to attend to [...]

The post Thermal Imaging Cameras Supply for Selandia Tankers Fleet appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Selandia Ship Management

VESSEL | Whole fleet + Tankers

DATE | Oct. 2015

LOCATION | Various

Project Brief

CTS Offshore and Marine Limited received an enquiry from Selandia Ship Management, one of the leading ship managers in the world, to attend to their need for new equipment.

Selandia Ship Management was looking for a specific equipment to prepare weekly reports on board of their tanker fleet and was not sure about which equipment to use due to limited budget.

Scope of Work

CTS Offshore and Marine Limited recommended a special equipment of Thermal Imaging Cameras which can help vessels evaluate & understand heat points/areas, avoid any potential mishaps and maintain the ship in a good state.

Scope of work:

  • Assessment and supply of Thermal Imaging Cameras

Results

In consultation with our customer, we used our global network of distributors and partners to provide the best equipment possible with the latest specifications available on the market.

We provided our client with a special discounted price, which allowed them to save thousands of pounds while supplying one of the best equipment that uses the latest technologies.

This project was completed to the complete satisfaction of the client since we not only met our customer expectations but exceeded it, whether it was for the reduced price or the equipment quality. Besides, the project was delivered with ZERO incidents and within time.

Client Feedback

“CTS offered us a good discounted price, which was even better than the manufacturer ones.”

Download Case Study

Supply of Thermal Imaging Cameras Case Study

The post Thermal Imaging Cameras Supply for Selandia Tankers Fleet appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/hight-quality-thermal-imaging-cameras-supply-selandia-tankers-fleet/feed/ 0
Quality Supply of Spare Parts Restore Aux Engine to Full Operation https://www.ctsom.com/case-studies/quality-supply-spare-parts-restore-aux-engine-full-operation/ https://www.ctsom.com/case-studies/quality-supply-spare-parts-restore-aux-engine-full-operation/#respond Sat, 16 Jan 2016 12:05:00 +0000 https://www.ctsom.com/?post_type=avada_portfolio&p=18025 CLIENT | Anonymous VESSEL | Tanker DATE | December 2015 LOCATION | Dubai Project Brief The company approached CTS with a challenging opportunity after their ship had a breakdown on board on one of the Auxiliary Engine. The block, badly damaged, needed immediate repair [...]

The post Quality Supply of Spare Parts Restore Aux Engine to Full Operation appeared first on CTS Offshore and Marine Limited.

]]>

CLIENT | Anonymous

VESSEL | Tanker

DATE | December 2015

LOCATION | Dubai

Project Brief

The company approached CTS with a challenging opportunity after their ship had a breakdown on board on one of the Auxiliary Engine. The block, badly damaged, needed immediate repair and the engine block had to be replaced.

The company approached CTS “in situ” cost-effective services to repair the significantly damaged block for Wartsila 6L20 Engine. Our past experience working on similar engines allowed us to respond quickly and efficiently to our client’s needs.

Following assessment of the damage, CTS technicians recommended that the block should be removed and replaced by a second-hand block. CTS spares/supply department services allowed us to reduce the cost for the client while providing safely quality spares products in a short amount of time.

Scope of Work

  • Assessment of the damage,
  • Use of CTS Network in ship Breaking yards of India, Bangladesh to source a Second-Hand Block,
  • Success in matching the block with existing block on board despite various executions of the engine,
  • Suitability assessment of the block before it was shipped,
  • Second-Hand equipment tested for cracks (MPI)
  • Measurements / inspection done on all critical areas of the Block + Sand Blast.

Project Gallery

Results

Our client relied on CTS for the supply of high quality, cost effective spares to support their operations. The engine was restored to full operation and the project was delivered safely, in time and within budget.

Client Feedback

“CTS has once again proved that they are reliable, committed and deals with any situation in the most professional way”

Download Case Study

Spares & Equipment Case Study

The post Quality Supply of Spare Parts Restore Aux Engine to Full Operation appeared first on CTS Offshore and Marine Limited.

]]>
https://www.ctsom.com/case-studies/quality-supply-spare-parts-restore-aux-engine-full-operation/feed/ 0